Most of the exterior walls are set on 2nd floor at MWA - B |
![]() |
The stone veneer is nearly complete on the courtyard side of the building |
![]() |
We are pouring the last wall of building A today so the last couple
pre-cast planks can be set.
|
![]() |
Elevator shaft on building A is up to the 2nd floor level. |