Wednesday, December 21, 2016

Project Update

Clubhouse interior walls are going up.






Building C - roof lines are starting to take shape.



Pre-cast is 3/4 of the way set on building B.





The entire basement in building C is poured and
we are about 70% finished with building B lower level.





1/2 the roof of C is sheathed.


Friday, December 16, 2016

Pre-cast, Pool & Roof

The crane has arrived and has started setting the 2nd layer of pre-cast on building B.





Roof trusses are getting braced and sheathing is starting to be installed.



The pool is being grounded and tentatively schedule to get sprayed on Wednesday.

Wednesday, December 14, 2016

Project Update


Half of the roof trusses have been set.




 The steel rebar for the pool is going in.


The masons have started laying the stone. They will be off until Tuesday
 next week due to the cold weather.








The last small walls of foundation B are being formed.


1/2 of building B has been backfilled in preparation of pre-cast.


A view of building A - starting to show how the roof is going to look.


Friday, December 9, 2016

Update

Swimming pool walls are framed up.


Masons are building their tents


The 2nd foundation wall of building B is being poured.






Roof truss sections are building built in preparation of swinging on Tuesday.


The clubhouse is cleared and ready to start putting back together.



Thursday, December 8, 2016

Update

The walls are braced ready for the 2nd pour of building B - upper parking garage.


The masons are setting up scaffolding in preparation for installing the stone veneer.



The base layer of gravel for the pool is being installed.


Wednesday, December 7, 2016

Project Update

The swimming pool is starting to go in.




Building B - upper level parking garage walls are going up.



Windows are starting to be installed.